Factors to Consider for Site Logistics in Project Execution

Published by
info@projectfreight.net

The work conditions and logistics of a job site play a crucial role in the preparation of a Project Logistics tender and timely execution of the project. It is important to evaluate the site carefully and identify any potential risks, taking necessary mitigating actions to reduce them.

The site evaluation must include a definition of site perimeters, access difficulties due to location, ground and soil conditions, permits, right of ways, health and safety, and security.

Site access and availability conditions should be evaluated carefully, with clearly defined responsibilities for the customer and contractor during the tender phase. The customer must guarantee unrestricted access to and use of the site, including access roads and right of ways. The responsibility for obtaining any required permits and right of ways must be clearly defined.

Sub-soil risks are not the responsibility of the logistics company, unless specifically taken under the main contractor’s responsibility. In such cases, ground conditions must be investigated prior to bid submission as they can impact operations and costs if transport or lifting operations cannot proceed as planned.

Soil investigations

Site logistics infrastructure, including fencing, utilities, storage, security, health and safety, must be defined and evaluated. Site activities, including quality assurance and quantity control, should be planned and documented, and shared through a Project Freight Management online tool.

The logistics company should explicitly exclude responsibility for any hazardous or toxic waste at the site related to transport and logistics, as much as possible taking into consideration local laws.

The availability of electricity, cooling media, loading, and other requirements for delivered equipment and logistics solutions should also be considered and evaluated.

info@projectfreight.net

Recent Posts

Securing Your Cargo: Essential Strategies for PFN Members to Prevent Theft

Cargo theft surged in 2024, with 3,625 reported incidents, a 27% increase from 2023. PFN…

17 hours ago

Chapter 6 – Technology in Project Logistics

Technology has revolutionized logistics, transforming it from a paper-heavy process into an efficient system driven…

2 weeks ago

Navigating the Complexities of Dangerous Goods and Hazardous Materials in Maritime Logistics

Dangerous goods and hazardous materials pose significant challenges in maritime logistics, requiring strict adherence to…

1 month ago

Everok Group Leads the Way in RO-RO Shipping with MAFI Trailers

Everok Group, China’s exclusive Project Freight Network member, leads RO-RO shipping with MAFI trailers, moving…

1 month ago

Trump Tariffs: How Shipping and Trade Adjusted in a Global Market

The Trump tariffs reshaped global trade, spiking shipping rates, diversifying supply chains, and driving demand…

2 months ago

[Part 3] Handling Project-Specific Risks in Logistics: Staying Ahead of the Curve

Managing logistics in large-scale projects involves handling risks like regulatory issues, unforeseen delays, and geopolitical…

2 months ago