Show Case: PFN Turkey loads Generators

PFN Turkey, Project Cargo & Yacht Transport loaded 2 generators.
The generators both weigh 60-ton and were safely loaded onboard the ship.
Loading and boarding were done in cooperation with A.P. Moller – Maersk /Elçin Ayaş Bozkurt.

Yonca Karakurum Tabib, Project manager of PCYT, says: “We would like to thank A.P. Moller – Maersk /Elçin Ayaş Bozkurt for their support.”

Follow their journey get connected with their team of professionals at turkey@pfn-network.com or visit www.pfn-network.com